Skip to Content Skip to Chat
Report an accessibility issue.
This is a test alert from the Office of the Governor.  This alert displays across all sites under Sitecore and appears at the top of the page.
Connecticut state logo State of Connecticut
×
 
Close Search
  • Arabic
  • Chinese (Simplified)
  • Chinese (Traditional)
  • English
  • Filipino
  • French
  • German
  • Haitian Creole
  • Hindi
  • Italian
  • Korean
  • Pashto
  • Polish
  • Portuguese (Brazil)
  • Russian
  • Spanish
  • Ukrainian
  • Vietnamese
Department of Transportation
Department of Transportation logo
Department of Transportation
  • Facebook
  • X
  • Linkedin
  • Instagram
  • YouTube
Department of Transportation
☰ Department of Transportation Main Menu
× Close
⮐ Back
⮐ Back
  • Home
  • Travel Gateway
    • Roads and Highways
      • Park and Ride
      • Parkway Restrictions
      • Rest Areas
      • Traffic Monitoring Data
    • Motorcycle resources
      • CONREP
    • Public Transportation
      • CT Buses
      • CT Ferries
      • CT Rails
      • CTDOT Ridesharing
    • Bicycle and pedestrian resources
  • Business
    • Resources
      • Consultant Resources
      • Contractor Resources
    • Contracting & Project Awards
      • Contracting Drawing Standards
      • Project Awards
    • CTDOT Manuals
    • CTDOT Permits
    • Project Status
  • Careers
  • About us
    • Commissioners Corner
    • CTDOT Bureaus
      • Bureau of Engineering and Construction
      • Bureau of Finance and Administration
      • Bureau of Highway Operations and Maintenance
      • Bureau of Policy Planning
      • Bureau of Public Transportation
    • CTDOT Resources
  • Contact us
  • Press releases
  • FAQ

You are about to Logout

Are you sure you want to log out of your account? If you do want to logout, please click "Logout".
Logout
CTDOT Press Release Header graphic

Public Invited to Meeting Regarding the Replacement of Bridge No. 06926 Carrying Mountain Road over Spaulding Brook in Norfolk

Share:

facebook logo Facebook
twitter logo Twitter
12/29/2023

CTDOT holding a virtual meeting on Wednesday, January 10, 2024, at 7:00 p.m.

The Connecticut Department of Transportation (CTDOT) will conduct a virtual public information meeting concerning the replacement of the bridge carrying Mountain Road over Spaulding Brook in Norfolk on Wednesday, January 10, 2024, at 7 p.m. 

The meeting provides the public and local community the opportunity to offer comments or ask questions regarding the proposed project. A question and answer session will immediately follow the presentation, which will be recorded. For instructions on accessing the meeting and ways to provide comments and ask questions, please visit https://portal.ct.gov/DOTNorfolk97-98.

The purpose of the project is to address structural deficiencies associated with the poor condition of the existing bridge, which were identified in recent inspections. The existing 1950s three-cell steel culvert that carries Mountain Road over Spaulding Brook will be replaced with a new single span bridge.

Traffic will be detoured during construction through a short 1.4-mile detour around the bridge. There are right-of-way impacts associated with the proposed improvements.

Construction is anticipated to begin in spring 2026 based on the availability of funding, acquisition of rights of way, and approval of permit(s). The estimated construction cost for this project is approximately $1.86 million. This project is anticipated to be undertaken with 80% federal funds and 20% state funds.

“This project will replace the nearly 70-year-old culvert with a new, modern structure, which will improve safety and reliability for motorists,” said Connecticut Department of Transportation Project Manager Marc Byrnes. “We hope the public attends this meeting live or watches the recording to learn more about the project, ask questions, and share feedback with the CTDOT project team.”

Individuals with limited internet access can listen to the meeting by calling (877) 853-5257 and enter Meeting ID 851 0956 2657. Individuals with hearing and/or speech disabilities may dial 711 for Telecommunications Relay Services (TRS). Individuals with limited internet access may also request that project information be mailed to them within one week by contacting Andrew Shields at Andrew.Shields@ct.gov or (860) 594-2077.

Language assistance may be requested by contacting the CTDOT Language Assistance Call Line (860) 594-2109. Requests should be made at least five business days prior to the meeting. Language assistance is provided at no cost to the public and efforts will be made to respond to timely requests for assistance.

This meeting will also be livestreamed on the CTDOT YouTube channel; no registration is required. Non-English language closed captioning will be available on Zoom and YouTube. The recording will also be posted immediately following the meeting in the list of CTDOT virtual public meetings at portal.ct.gov/ctdotVPIMarchive.

Members of the public can submit comments and questions during the two-week public comment period following the meeting. Please submit comments and questions by January 24, 2024, to DOT-FLBP@ct.gov and (860) 594-2020, or to Andrew Shields at Andrew.Shields@ct.gov or (860) 594-2077. Please reference State Project No. 0097-0098 in the email or voicemail.

Media Contact:

FOR MEDIA INQUIRIES:
OFFICE OF COMMUNICATIONS
860-594-3062
CTDOTMedia@ct.gov

Twitter: @CTDOTOfficial
Facebook: Connecticut Department of Transportation

 

Share this information on:

DPH IMMUNIZATIONS
Facebook X LinkedIn YouTube Instagram

410 Capitol Avenue
Hartford, CT 06134

PHONE: 860-509-7929
FAX: 860-707-1925
CT.gov Logo
  • About CT
  • Policies
  • Accessibility
  • Directories
  • Social Media
  • For State Employees
US Flag icon
United States
Mast: (Full)
Connecticut Flag icon
Connecticut
Mast: (Full)

© 2025 CT.gov - Connecticut's Official State Website